Hemodialysis Solutions

In the facility built according to GMP rules, hemodialysis solution production in an amount and quality to meet all needs of Iraq will be made in the middle of 2021.

World Class

Hemodialysis Solutions

Under the control and consultancy of the Iraqi Ministry of Health in Baghdad, Iraq, and under the control and consultancy of Medisol, the production of hemodialysis solutions in the amount and quality that will meet all the needs of Iraq in the facility built according to GMP rules will be made in the middle of 2021. All of the requirements such as human resources, raw materials, logistics and know-how of the facility, which is established on a total area of 2000 square meters, 1000 square meters of which is closed, are fulfilled by Medisol.
All products in the facility are produced in accordance with European standards by our experienced and well-equipped staff.